Monday, October 29, 2012
San Antonio River, Mission Reach, Theo Ave Trailhead downstream
Today's photos:
Last week the newest section of the San Antonio River Mission Reach, Phase 2, Greenway trail opened with a trailhead on Theo Ave. This section of the trail goes downstream along the bank on the west side of the river, crosses Concepcíon Creek over a pedestrian bridge and joins the main greenway trail at the pedestrian bridge over the river just upstream from Mission Rd. The closest parking to the Theo Ave trailhead is in Concepcíon Park. This new section of trail completes a loop from the Concepcíon Park trailhead.
The new section of trail remains closer to the river bed than the trail along the east side of the river. It also provides a new angle of view to the large embayment area in this section of the river.
No comments:
Post a Comment